Hazardous Material Information System (WHMIS) for all chemicals prior to using them on site. The Contractor must supply up-to-date safety data sheets (SDS) as per workplace.The written report must include the pest control product number of products applied. The Contractor must provide a written report of all scheduled and unscheduled inspections to the Chief, Material Management listing the services provided and any areas where changes could be made that would eliminate existing pest problems and recommendations on improving cleanliness standards.The Contractor must ensure all pesticides are applied by a duly licensed operator. All pesticides the Contractor uses must comply with the Federal Pest Control Products Act.The Contractor must list all tools, equipment and supplies on the tool registry before being processed into the Institution. The Contractor must supply all personnel, tools, equipment and supplies required to perform the work.The Contractor must give a minimum of two hours notice to the Chief Material Management prior to pesticide application if evacuation is required and provide a safe return time for any closed structure, office or building. The Contractor must provide a copy of the licence to the Contract Authority.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |